This week’s ODOT repair report

The Ohio Department of Transports reports that State Route 2/Fulton Street Slope Repair will continue through November, with lane restrictions possible on Fulton Street between Wilcox Road and SR 2. Traffic is maintained by temporary signals.

State Route 2 Slope Repairs will be made through mid-November, with lane restrictions possible on SR 2 between the SR 163/SR 2 interchange and West Fremont Rd.

The SR 2 work between SR 269 and Martins Point Road over Sandusky Bay will resume in Spring 2020.

Leave a Reply

Your email address will not be published. Required fields are marked *